Quick Notes
Sector: Commercial
Contract Type: BMS
Mech Contractor: ACES Air Conditioning
The background
Results
Our solution
Once we finished the BMS, after the DLP period, we put in place a smart VAV selection strategy that will minimise the heating and cooling air flows from the AHUs while guaranteeing thermal comfort throughout the building. This will reduce operational costs while increasing tenant wellbeing.
In addition, we have applied advanced control strategies which target the pressure and temperature reset controls on the Air Handlers with the intent of reducing energy consumption while maintaining excellent indoor air quality.
We fine-tuned the AHU’s economy cycle to allow for more free cooling from the outside air. We have optimised the underfloor heating by tuning the setpoints and strategy in place to allow gradual heating through the slabs while ensuring long heating hours with outside air lockouts. Those changes in setpoints were compensated by adjusting the lobby AHU’s setpoints.
Lastly, we have installed an additional pressure sensor on the ground level, significantly improving our monitoring and control over the atrium fans. Our thorough tuning and optimisation on the building’s atrium pressure allowed us to have improved sensitivity and control over the pressure reset strategy while maintaining positive building pressure.