Quick Notes
Sector: Commercial
Contract Type: BMS
Location: Neon House, Level 6, 8/10 Hobart Pl, Canberra ACT 2600
Devloper: Rain and Horne
The background
Challenges
Our solution
Our scope entailed a Full BMS cut-over including replacement of old pneumatic control hardware and control of a dual duct full building HVAC system. We were able to develop a solution using our Optergy platform, Alerton DDCs, installation of new Belimo 24v control actuators and ABB variable speed drives (VSDs).
We were able to develop a control strategy to effectively operate the dual duct system including reducing fan speeds where appropriate and zoning the areas within the building for more efficient after hours operation. We were also able to facilitate after hours billing which enables the owner to recoup the cost of operating the building outside of the tenants contracted hours.