Quick Notes
Sector: Education
Contract Type: BMS & EMS
Location: 269 Ulan Rd, Mudgee NSW 2850
Mech contractor: CH003
The background
Challenges
Outcome
Our solution
Alerton provided the BMS for the new building, which allowed the building operators to directly control the HVAC (Heating, Ventilation, Air-Conditioning) system, which can only be activated at the occupant’s request, minimising unnecessary gas and power usage. We installed Energy Recovery Ventilators to improve the efficiency of the HVAC system by preconditioning the outside air using conditioned exhaust air. We installed panels in most of the rooms to alert occupants if the outside weather conditions are suitable for natural ventilation. We used our Optergy Enterprise system interface to give operators visibility of the buildings water and energy consumption, so they can track and regulate usage based on customised reports. The interface allows operators to compare usage trends and options to reduce consumption and improve efficiency. The reports are real-time and feature the weather conditions, consumption data, and sustainable building features to allow managers for productive planning.

